Serwis internetowy inzynierbudownictwa.pl wykorzystuje pliki cookies. Korzystanie z serwisu oznacza zgodę na ich zapis lub odczyt zgodnie z ustawieniami przeglądarki.     Zamknij
Kariera / Język angielski

New Year's Resolutions for the Construction Industry
New Year's Resolutions for the Construction Industry 2017-01-11

Posłuchaj:
Pobierz:

The start of a new year usually brings about New Year’s resolutions. We tend to reflect on our accomplishments in the previous year and set goals for the year ahead. It is also good to consider what resolutions we can make and keep for 2017 for our industry. Below please find the three of them. Although rather standard, if successfully followed, they can significantly improve the construction environment in which we operate.

  więcej»

Dział Język angielski

Building a house - traditions, customs, rituals, superstitions and myths
Building a house - traditions, customs, rituals, superstitions and myths 2016-11-28

Posłuchaj:
Pobierz:

We have passed the time of customs and rituals related to celebration of All Saints' Day, Polish Independence Day, St. Martin's Festival or St. Andrew's Day. And we head toward Christmas, rich with many beautiful traditions. Interestingly, there are also customs and superstitions which are linked directly to the construction industry, especially building a house. Many of them are forgotten, while others lasted for centuries and are still known nowadays.

  więcej»

Dział Język angielski

OHS for earthworks
OHS for earthworks 2016-10-31

Posłuchaj:
Pobierz:

Almost every single construction works start with excavations. Many upgrade projects also require earthworks in order to erect or replace service lines.

  więcej»

Dział Język angielski

Railway construction
Railway construction 2016-10-03

Posłuchaj:
Pobierz:

The railway in Poland began in 1835, when a railway line from Warsaw to Zagłębie Dąbrowskie and Cracow was opened. More lines were built afterwards. Prior to World War Two, there were 306 km of 115 km/h rated railway lines and 2035 km of 100 km/h rated lines. Following its accession to the EU, Poland began adapting its railway system to high-speed operations (200-250 km/h) which require novel construction technologies for the railway industry.

  więcej»

Dział Język angielski

Occupational Health and Safety
Occupational Health and Safety 2016-09-05

Posłuchaj:
Pobierz:

Occupational health and safety (OHS) is a set of rules and provisions concerned with creating working conditions that do not endanger the life and health of workers.

Basic OHS requirements are described in Chapter X of Polish Labour code, the regulation on general occupational health and safety provisions (JoL. of 1997, No. 129, item 844 as amended), Polish Standards, and other regulations. The National Labour Inspectorate (PIP) supervises the compliance with OHS rules and provisions.

  więcej»

Dział Język angielski

From design to maintenance: a quiz
From design to maintenance: a quiz 2016-07-18

Posłuchaj:
Pobierz:

The summer has finally arrived and it's a holiday season. What's more, we have just finished a series of lessons about different stages of building a home. It seems a good time to brush up your English and revise vocabulary and expressions related to the construction industry. Complete the following tasks and check what you remember from all the fourteen lessons published in "Inżynier Budownictwa" monthly starting from March 2015.

  więcej»

Dział Język angielski

From design to maintenance: declaration of use
From design to maintenance: declaration of use 2016-05-02

Posłuchaj:
Pobierz:

Once a house is constructed, its acceptance must be carried out for you to be able to legally live in it. To do so you must take care of many formalities, in particular collect the necessary documents, and then submit them to the relevant Construction Supervision Inspectorate together with a notice of completion of construction and an application for occupancy permit.

  więcej»

Dział Język angielski

From design to maintenance: land development
From design to maintenance: land development 2016-04-06

Posłuchaj:
Pobierz:

An already built and beautifully finished house does not mean the end of building works. One should still take care of its surroundings. After all, no one wants to live on a construction site. On the contrary, we want to have a nice, well-ordered and functional plot, which will be the pride of our home and, along with it, will fit into a harmonious whole.

  więcej»

Dział Język angielski

From design to maintenance: installations (part III)
From design to maintenance: installations (part III) 2016-03-07

Posłuchaj:
Pobierz:

Carrying out the electrical installation works includes electrical service connection, concealed installations (wiring) as well as electrical equipment. When dealing with wiring, you should remember to install telecom cabling systems (interphones, telephones, antennas, computer networks, etc.) as well as an alarm system.

  więcej»

Dział Język angielski

From design to maintenance: installations (part II)
From design to maintenance: installations (part II) 2016-02-11

Posłuchaj:
Pobierz:

The main task of the central heating system is to ensure proper temperature in usable rooms, thereby providing thermal comfort for occupants. The choice of a home heating system has a significant impact on its future running costs, energy consumption, as well as air pollution (smog). The domestic central heating is often installed along with the hot water system.

  więcej»

Dział Język angielski

From design to maintenance: Installations (part I)
From design to maintenance: Installations (part I) 2016-01-11

Posłuchaj:
Pobierz:

Carrying out the installation works is a very important step in building a house. Hidden installations are performed once the building shell is complete, yet before or during some of the finishing works (i.e. plaster works, subfloors, drywalls, suspended ceilings). Any visible installations are done once the finishing works are complete.

  więcej»

Dział Język angielski

From design to maintenance: insulation
From design to maintenance: insulation 2015-11-30

Posłuchaj:
Pobierz:

By definition, insulation is a barrier separating the two adjacent systems, elements or spaces of different properties to prevent or hinder their interaction. Insulation also protects the building's interior from external influences, as well as creates a comfortable microclimate for the people staying there.

  więcej»

Dział Język angielski

From design to maintenance: floors
From design to maintenance: floors 2015-11-02

Posłuchaj:
Pobierz:

The floor serves as a finishing element for horizontal partitions of the building. It usually consists of several layers and should be done after plastering, as one of the last finishing works. The floor provides thermal, acoustic and damp insulation, transfers the loads, as well as is an essential element in interior design.

  więcej»

Dział Język angielski

From design to maintenance: Internal plaster works
From design to maintenance: Internal plaster works 2015-10-01

Posłuchaj:
Pobierz:

The plastering begins the stage of finishing works in a building. You can set about plastering once you have electrical, plumbing and central heating systems carried out. Youshould also install windows and exterior doors to protect the building from the weather. This is particularly important if you plan to carry out plaster work when the temperatures are low, i.e. below 5oC.

  więcej»

Dział Język angielski

From design to maintenance: roof and roof coverings
From design to maintenance: roof and roof coverings 2015-09-02

Posłuchaj:
Pobierz:

Besides its structural function, the roof serves as a very important protection from the weather and just as important architectural feature of the building. The choice of its type, size and shape, as well as the type and colour of roofing material is a considerable challenge for both a de­signer and future users. the roof consists of two main elements: the supporting structure and roofing. One may say that a well-made roof is the one, from which the water is drained efficiently and there is not a thick layer of snow lying on it.

  więcej»

Dział Język angielski

From design to maintenance: other structural elements of the building
From design to maintenance: other structural elements of the building 2015-07-20

Posłuchaj:
Pobierz:

Staircases, columns, beams and binders are the struc­tural elements that play a key role in the statics and functionality of the building. The stairs serve as a connection between different storeys. Columns, beams and binders allow for an increase in the roof span, and thus the size of the rooms, limiting the need for load-bearing walls. It is particularly significant when building various types of halls (e.g. storage and market ones) as well as garages (under­ground, ground-based, single- and multi-storey ones).

  więcej»

Dział Język angielski


1 2 3 4 5 6 Następna >>



Zaprenumeruj Wypisz się
 

Środa
18
Styczeń
 Styczeń 2017 
Pn Wt Śr Cz Pi So Nd
2627282930311
2345678
9101112131415
16171819202122
23242526272829
303112345
 Imieniny obchodzą dziś:
Beatrycze, Bogumił, Krystyna, Liberata, Małgorzata i Piotr
Wydawnictwo Polskiej Izby Inżynierów Budownictwa Sp. z o.o., ul. Kopernika 36/40, lok. 110, 00-924 Warszawa, tel. 22 551 56 00
KRS 0000192270 (Sad Rejonowy dla m.st. Warszawy, XII Wydział Gospodarczy KRS), NIP 525-22-90-483, Kapitał zakładowy 150 000 zł

© Copyright by Wydawnictwo Polskiej Izby Inżynierów Budownictwa Sp. z o.o. 2006-2015
Publikowane artykuły prezentują stanowiska, opinie i poglądy ich Autorów